Hostage Set after 3 hours with main support walls up
Hostage Set at the end of a productive first day we have the 2nd story up
Hostage Set day 2 with the platform up
Hostage Set on 2/14 showing walls and platform
ostage Set on 2/14 showing stairway, walls and round window installed
ostage Set on 2/17 with 2nd story drapes
Hostage Set construction almost done, getting ready to paint
Hostage Set final paint, and ready for set dressing
Building the
set for
The
Hostage
February, 2008
33 Hours
End of Day 1
2/20/08
Final paint, ready
for set dressing
and lights
Getting ready
to paint
Photos were taken under stage work
lights and do not show the wonderful
Stage Lighting by Dan Martin
2/11/08
2/12/08
2/14/08
2/17/08
2/14/08
2/14/08
2/18/08